Post-construction cleaning

We prepare premises for handover and move-in after finishing work: removing construction dust, adhesive, paint and cement residue, taking off protective films, and cleaning glazing and floors.

Post-construction cleaning is not simply a larger-scale deep clean; it is a different task. Construction dust settles again, cement, adhesive and paint residue require different cleaning products, and the wrong product can damage new finishes or surfaces beneath protective films. For this reason, the service is offered separately and priced after a site visit.

The work usually takes place in two passes: an initial pass during the final stage of finishing or immediately afterward, and a final pass before move-in. This keeps dust from settling on surfaces that have already been cleaned.

Post-construction cleaning

Types of sites

01

Offices and office suites after tenant fit-out

02

Commercial premises before opening: retail stores, restaurants and clinics

03

Business centre floors after renovation of common areas

04

Hotels and administrative buildings after refurbishment

05

Premises after limited renovation: replacement of finishes or changes to the layout

Scope of work

Step 1

Site visit and assessment of soiling
We check which materials have been installed, what is covered with film, and where cement, paint, expanding foam and sealant residue remains. This determines the cleaning products and order of work.

Step 2

Debris removal and initial pass
We remove small construction debris, packaging and dust from top to bottom: ceilings, light fixtures, walls and window sills.

Step 3

Removal of protective films and installation residue
Protective films on glazing, doors and fittings; adhesive and tape residue, stickers, and paint and filler splashes.

Step 4

Glazing and frames
Glass, window reveals, frames and interior window sills. Cleaning the exterior at height is a separate facade service.

Step 5

Floors
Removal of cement dust and efflorescence, machine cleaning of hard floors, and cleaning of skirting boards and joints.

Step 6

Bathrooms, kitchens and utility areas
Sanitary fixtures, tiles, grout joints and fittings; grout and silicone residue.

Step 7

Final pass and handover
A second removal of settled dust and handover of the premises to the person responsible on the site’s behalf.

What is not included

  • Removal of bulky construction debris and wasteAvailable separately: loading and removal are priced by volume.
  • Repair of finishing defects: chips, scratches and stains absorbed into the material
  • Dismantling and installation of structures, furniture and equipment
  • Deep cleaning of carpets and upholstered furnitureA separate service that can be combined with the final pass if needed.
  • Cleaning exterior facade glazing at height
  • Cleaning the surrounding grounds

What affects the price

The price is determined after a site visit and recorded in the contract.

01

Floor area and number of storeys

02

Degree and type of soiling: dust, cement, paint and adhesive

03

Amount of glazing and protective film

04

Finish materials and their sensitivity to cleaning products

05

One or two passes: initial and final

06

Handover schedule and working hours: daytime, nighttime or weekends

Personnel and documentation

Cleaning products and equipment

A cleaning product is selected for each material; this is particularly important for new finishes. We have our own equipment for collecting construction dust and machine-cleaning floors.

Personnel

A medical examination is a requirement for personnel admitted to the site. A crew of 4–8 people attends the site, with its composition recorded in advance.

Liability

Liability to the client under the contract is insured.

Documentation

We provide the crew list and confirmation of the safety briefing. For sites with controlled access, the list is agreed in advance.

Frequently asked questions

When is it best to arrange cleaning: before or after the renovation is complete?

The initial pass can take place during the final stage of finishing; the final pass takes place only after the builders have left. If cleaning is done just once before the work is complete, dust from the last operations will settle again.

Can you remove paint and cement residue from tiles and glass?

Yes, this makes up the main part of the work. How much can be removed depends on the material and how long the residue has been there: cleaning will not remove hardened cement from porous stone or etching marks from glass. We will point this out during the site visit.

Who removes the construction waste?

We can handle it: loading and removal are priced separately by volume. If the renovation contractor or site management removes the waste, we clean up small remnants, packaging and dust.

Can the cleaning be done at night before move-in?

Yes. We work night shifts, weekends and public holidays if the handover schedule calls for it.

Other services in this area

All Commercial building cleaning services

Discuss your site

Let's discuss your site.

Send us the address and a brief description of the task. We'll assess the scope of work and suggest a suitable service format.

Let's talk

Chat and callback

Or message usFullPro chat

Tell us how we can help

Ask a question or leave your number for a call.
Up to 10 photos per message.